Back to Course

How To Use Shovel (Help Center)

0% Complete
0/0 Steps
  1. 🤖 AI ASSISTANTS

    Using Shovel with AI assistants
  2. 🏫 CONNECT SCHOOL SYSTEMS
    How to sync school platforms with Shovel
  3. Connect Brightspace to Shovel
  4. Connect Canvas to Shovel
  5. Connect Moodle to Shovel
  6. 🗓️ CALENDAR
    Awake Time
  7. Create Your Schedule
  8. Minimum Study Time Block
  9. Start a new term/semester
  10. Add Holidays
  11. 📅 EXTERNAL CALENDARS
    View Google calendar events inside Shovel
  12. If your school blocks Shovel from your Google account
  13. If your school blocks Shovel from your Outlook account
  14. View Apple calendar events inside Shovel
  15. View Outlook calendar events inside Shovel
  16. Share Your Shovel Calendar With External Calendars (Google, Apple, Outlook)
  17. ✅ TASKS
    Upload Your PDF Syllabus — Shovel Will Create Tasks and Events Automatically
  18. Create New Tasks
  19. Create Repeat Tasks
  20. Create Exams
  21. How To Plan Tasks in Shovel
  22. How Auto-plan Works in Shovel
  23. How Bumpers Work in Shovel
  24. Task List
  25. How To Duplicate a Task
  26. Share your syllabus with friends or between terms
  27. Add Grades
  28. 📈 ANALYTICS
    Analytics
  29. The Cushion (Procrastination Curve)
  30. Study Streak Heat-Map
  31. 💻 HOW TO INSTALL SHOVEL ON YOUR DEVICES
    Tablets - How to install Shovel on iPad/tablet
  32. Phones- How to install Shovel on your phone
  33. Computers - How to install Shovel on your computer
  34. 🛠️ TROUBLESHOOTING
    Why can't I see my Canvas /Brightspace courses when linking my school platform?
  35. Can't login on mobile?
  36. Google calendar events don't show up in Shovel instantly
  37. Clear Your Browser Cache
  38. Notifications in Shovel Mobile App
  39. 👩‍🎓 Account
    Cancel/Pause Subscription
  40. Delete account
  41. How To Reset Your Password
  42. Change Email Address
Lesson 22 of 42
In Progress

How Auto-plan Works in Shovel

Auto-plan puts your tasks on your calendar for you. You tell Shovel how you like to study, and it finds time for your work in the free study time you already have, before each task is due.

This article explains what Auto-plan does, what each option in the Auto-plan window means, and why your plan may look the way it does.

The Basics

Where to find Auto-plan

Auto-plan is on the web app, on the main Calendar page. Look for the ✨ Auto-plan button at the top of the calendar.

  • It works in week and day views. It is not available in month view.
  • It is not on the Awake time or Study time pages.
  • It is not in the mobile app yet.

Auto-plan plans the dates you’re looking at

Auto-plan only plans the dates shown on your calendar right now. If you’re looking at Sep 20 – 26, it plans Sep 20 – 26. If you’ve switched to a custom number of days, it plans those days. The title of the Auto-plan window shows the dates, for example “Plan Sep 20 – 26”.

To plan next week, go to next week on the calendar first, then click Auto-plan.

What Auto-plan needs from you

Auto-plan works with three things you’ve already set up in Shovel:

  1. Tasks with time estimates. Auto-plan can only plan a task if it knows how long the task will take. Tasks without an estimate are skipped (you can estimate them right inside the Auto-plan window).
  2. Due dates. Shovel always plans work before a task is due, never after.
  3. Free study time. This is the free time on your calendar while you’re awake: your awake time minus your classes, activities, events, commutes, synced calendar events and sessions you’ve already planned.

What counts as free study time

Auto-plan never plans over anything already on your calendar. It only uses free study time. Very short gaps (shorter than your Minimum study time block) don’t count as study time.

If you want Auto-plan to have more room, you can:

  • Move, shorten or delete events
  • Adjust your Awake Time
  • Shorten your Minimum study time block

Which tasks get planned

A task is included when:

  • It has a time estimate.
  • It still has time left to plan (it isn’t already fully planned or marked as done).
  • Its planning window overlaps the dates you’re planning. A task’s planning window runs from its start date (its due date minus its “days to start ahead”) to its due date.

Hover over the task count at the top of the Auto-plan window to see which tasks are included.

Tasks that are only partly planned

Auto-plan only plans the time a task still needs. If a 4-hour task already has 1 hour planned, Auto-plan plans the other 3 hours. Time you’ve already marked as used also counts toward the task.

Step by Step: Using Auto-plan

  1. Go to the dates you want to plan on your calendar.
  2. Click ✨ Auto-plan (or ✨ Replan, see below).
  3. Look at the preview. Nothing is saved yet.
  4. Change any preferences you like. The preview updates as you change them.
  5. Deal with anything Shovel flags: missed sessions, overdue tasks, tasks without estimates.
  6. Click ✨ Plan (the button shows how much time will be planned, for example “✨ Plan 9h 45m”).
  7. The window shows “Planning…” for a moment, then closes, and your new study sessions appear on the calendar.

A short message confirms how much was planned, for example “Planned 9h 45m.”

Please keep the page open while it says “Planning…”. Refreshing the page at that moment cancels the plan.

The Auto-plan Window

The summary at the top

The top of the window shows how much time Auto-plan will put on your calendar and across how many tasks, for example “40h 50m across 12 tasks”.

The bar under it shows three kinds of time:

  • Now (purple): time that will be planned in these dates.
  • Left for later (light purple): work that belongs to later dates. It isn’t a problem. It will be planned when you plan those dates.
  • Won’t fit (red stripes): work that should happen in these dates but doesn’t fit in your free study time before it’s due.

The task groups

Below the summary, your tasks are sorted into groups so you can see exactly what will happen to each one:

  • Won’t fit: none of the task’s remaining time fits before it’s due.
  • Partially fit: some of the task fits, but not all of it.
  • Fully fit: all of the task’s remaining time is planned in these dates.
  • Split between now & later: part is planned now and the rest belongs to later dates. Nothing is at risk.
  • Left for later: the task’s work belongs to later dates, so nothing is planned for it now.

Click any task card to open the task.

When something won’t fit

If some work won’t fit, Shovel tells you before you plan:

  • A red “won’t fit” note appears next to the Plan button. Click it to jump to the tasks that won’t fit.
  • Each task that won’t fit says why when you hover over it, for example “No free study time before it’s due.”
  • A Create more study time in your calendar link closes the window so you can free up time.

You can still click Plan. Shovel will plan everything that fits. Tasks at risk of not being finished in time stay flagged by your Cushion.

Why a task is “Left for later”

This is normal. Your preferences decide when work on a task should happen. For example, if you chose Close to deadline and a task is due next week, its sessions belong to next week, so Auto-plan leaves them for when you plan next week.

If everything in the window is left for later, the Plan button is greyed out and Shovel explains that there’s nothing to plan in these dates yet.

When the Plan button is greyed out

The Plan button is greyed out when nothing can be planned, for example:

  • There are no estimated tasks for these dates.
  • There’s no free study time left in these dates.
  • All the work belongs to later dates.

Hover over the button to see the reason.

Missed sessions

Missed sessions lists study sessions from these dates and the last 7 days that have ended but were never marked as used.

Shovel treats a session that isn’t marked as used as missed, and plans that time again. If you did the work but didn’t mark it, Shovel thinks you still need to do it.

So before you plan:

  • Tick each session you actually did to mark it as used, or click Mark all as used.
  • Leave the ones you really skipped. Shovel will find new time for them.

You can also mark time as used straight from the calendar: past sessions show a ✓ Used? button (or a small ✓ on smaller sessions). You can turn these buttons off in Settings → Personalization.

🔥 Overdue

Auto-plan never plans work after a task’s due date. Tasks that passed their due date in the last 7 days and still have time left are listed under 🔥 Overdue (folded by default).

For each one you can:

  • Mark task complete, if you’ve already finished it.
  • Move due date (Tomorrow, In 3 days, In a week, or pick a date). The task then joins the plan if its new due date is in the dates you’re planning.

Older overdue tasks are in the Overdue section of your task list.

Not estimated

Tasks in these dates that don’t have a time estimate are listed under Not estimated. Auto-plan skips them until you estimate them.

You can estimate each one right here: pick a time (15m, 30m, 1h, 2h, 3h or your own), or, for a reading, type the number of pages. The task then moves into the plan, and a short note shows you which group it went to.

Replan

Fill free time vs. Replan

Auto-plan can work in two ways:

  • Fill free time: sessions already on your calendar stay where they are. Auto-plan only adds new sessions in the free time that’s left.
  • Replan: Auto-plan takes its own upcoming sessions in these dates off the calendar and plans the dates again from scratch. This is how missed sessions and new work get fitted in properly, with everything rearranged around them.

The Replan checkbox

When the dates you’re planning already have upcoming sessions that Auto-plan made, you’ll see a Replan N upcoming auto-planned sessions checkbox near the top of the window. It’s ticked by default, and the calendar’s button reads ✨ Replan instead of ✨ Auto-plan.

  • Ticked: Auto-plan rearranges its own upcoming sessions to fit missed sessions and new work. The preview already shows the result.
  • Unticked: Auto-plan only fills free time and leaves all existing sessions alone.

Which sessions Replan moves

Replan only moves sessions that are still Auto-plan’s own:

  • Sessions Auto-plan created that you haven’t changed. They show a small ✨ sparkle icon next to the time.

Replan does not move, by default:

  • Sessions you planned yourself.
  • Auto-plan sessions you’ve changed (moved, resized, or edited the notes, pages or time). Once you change a session, it becomes yours and the sparkle icon disappears.

If you have both kinds, an extra option appears under the Replan checkbox: Also replan N manually planned or edited sessions. Tick it if you want those rearranged too.

Replan never touches:

  • Sessions that have already started or are in the past.
  • Sessions marked as used.

Will Replan give me the same plan again?

If nothing has changed (same tasks, same calendar, same preferences), replanning gives you the same plan. To get a different plan, change your preferences or your calendar first.

Your Planning Preferences

Planning preferences tell Shovel how you like to study. They are on the right side of the Auto-plan window. Four cards are always visible, and more options are under Advanced preferences….

Every change updates the preview straight away, so you can try things and see what happens before you plan.

Pacing

When do you like to work on a task?

This decides how a task’s hours are spread between its start date and the day you want to finish it.

  • Get ahead: most sessions early, a few closer to your finish day.
  • Spread out (Shovel’s default): evenly from the start date to your finish day.
  • Close to deadline: a few sessions early, most close to your finish day.

With Close to deadline, more of your work may be “Left for later” when you plan a week, because it belongs closer to the due date.

When do you like to finish a task?

How early you want to be done, to leave a buffer.

  • Two days before
  • The day before (Shovel’s default)
  • On the day it’s due (sessions still end before the due time)

If there’s no free time before your finish day, Shovel may plan some work after it (but always before the due date). It tells you when that happens.

Study sessions

Ideal deep work session length per task

How long you like to work on one task in one sitting: 45m, 1h, 1h 30m (Shovel’s default), 2h or 3h.

  • Smaller tasks stay in one session.
  • Bigger tasks are split into several sessions close to this length.

Shovel also keeps any single sitting on one task from getting too long, based on this length.

How should a bigger task’s sessions change?

When a task is split into several sessions, this decides how their lengths change over time. It doesn’t change how many sessions there are.

  • Get shorter: longest first, shortest last.
  • Stay similar (Shovel’s default): every session about your ideal length.
  • Get longer: start short to ease in.

If a task is split across weeks, it carries on where it left off rather than starting over.

Study schedule

Preferred times of day to study

Pick one or more: Mornings (before 12 pm), Afternoons (12 – 5 pm), Evenings (after 5 pm).

  • This only chooses when during the day your sessions go, among the free times that are available. It never moves work to a different day and never creates extra time.
  • If that time of day is already full, sessions go at other times.
  • If you pick nothing, longer sessions go to late morning and afternoon first, then evening.

Days off

Pick days you don’t want to study. Auto-plan won’t plan anything on them, unless the week is so full that it’s the only way to fit work that’s due (it tells you if that happens).

Most planned study time in a day

The most study time Auto-plan should plan on a single day: 2h, 3h, 4h, 5h (Shovel’s default), 6h, 8h, or No limit.

Sessions you’ve already planned that day count toward it.

Review sessions

Add review sessions after reading tasks is on by default (Recommended).

When it’s on, each reading task gets two short 15-minute review sessions: one about a day after the reading and one about a week after. In each review you answer the practice questions you wrote while reading, from memory, then check your answers.

Good to know:

  • Reviews are only for readings, not for problem sets or other tasks.
  • Reviews are real tasks. They appear in your task list in a category called Auto-review (🔁), and you can complete or delete them like any other task.
  • Reviews are created when you click Plan, not before. In the preview they show as “Review: [reading name]”.
  • If you delete a review, Shovel won’t create it again.
  • If you don’t want reviews, untick the box.

Advanced preferences

Breaks

All five of these are time Shovel keeps free.

Break after deep work

The break after a session of a task over 45 minutes (“deep work”): 10m, 15m (Shovel’s default), 20m or 30m.

Break after a small task

The break after a small task: No break, 5m (Shovel’s default) or 10m.

Break after classes and events

Time to get to your study spot after a class or event: No break, 5m, 10m (Shovel’s default), 15m or 30m. Skipped when a commute follows the event, because the commute already covers that time.

Wait before studying after waking up

How long after you wake up before study can start: None, 15m, 30m (Shovel’s default), 45m or 1h.

Stop studying before bed

How long before your bedtime study should stop: None, 15m, 30m, 45m (Shovel’s default) or 1h.

Courses

What goes first in a study block?

When tasks from different courses share one study block, this decides their order.

  • Due soonest: the task due soonest goes first.
  • My course order: tasks from courses higher in your list go first. Drag the courses to set the order.

This only changes the order inside a block. It never moves work to another block or day.

Per-course preferences

You can set preferences for each course:

  • Preferred times of day for that course. These come first for that course; your general preferred times are the backup.
  • Light days: only tasks of 45 minutes or less from this course go on these days, and deep work goes on other days. Tip: set your lecture days as light days.

When not everything fits

This matters only in weeks without enough free study time for everything. How should the time be shared?

  • Due soonest first: the task due soonest gets all its time first.
  • Start everything (Shovel’s default): each task due in these dates gets a 30-minute start, then the rest goes to what’s due soonest.
  • Some time for each: each task due in these dates gets part of its time, bigger tasks more.
Task priority flags

Whatever you choose above, priority flags come first:

  • Tasks flagged High, then Medium, get their time first.
  • Tasks flagged Low go last.

So if something must not be squeezed out, flag it High.

Ranking your preferences

There are two lists you can reorder by dragging.

Hardest to give up

When your work won’t fit, Shovel may have to give up some of your preferences to make room. This list decides which ones go first. Put the ones you care about most at the top. The ones at the bottom are given up first.

Shovel’s default order, from most important to least:

  1. Time after waking & before bed
  2. Days off
  3. Most planned study time in a day
  4. Deep work session length
  5. Breaks
  6. A course’s light days
  7. A task’s start date

This means that in a tight week, Shovel will first start work earlier than the task’s start date, before it shortens your breaks or makes your days longer.

Most worth having

These preferences never stop work from fitting. They only choose which of your free days and times work lands on. When two of them want different things, the higher one wins.

Shovel’s default order:

  1. When you like to finish a task
  2. Preferred times of day to study

When Shovel Gives Up a Preference

Shovel follows your preferences whenever it can. When there isn’t enough free time to fit everything that’s due, it may bend some of them, starting with the least important one in your Hardest to give up list.

When that happens, you’ll see a note under “Your planning preferences”, for example: “To fit your work, Shovel gave up 1 preference”. Click it to see which preference was given up and how often it was met.

If you’d rather not give up that preference, you can:

  • Move it higher in your ranking.
  • Create more free study time on your calendar.
  • Accept that some work won’t fit, and plan anyway.

What Shovel never does

No matter what, Auto-plan will never:

  • Plan work after a task’s due date.
  • Plan over your classes, events or other things on your calendar.
  • Move or delete sessions that have already started or are marked as used.
  • Plan anything in the past.

Saving Your Preferences

When you change a preference, a Save preferences as my default checkbox appears next to the Plan button. It’s ticked, so your changes are saved for next time when you plan.

Untick it if you only want to use the changes for this one plan.

To go back to Shovel’s recommended settings, click Reset at the top right of “Your planning preferences”. It only appears when your settings differ from Shovel’s.

After You Plan

Your new sessions

New sessions appear on your calendar with a short animation. Each one created by Auto-plan has a small ✨ sparkle icon next to its time.

You can treat them like any other planned session: move them, resize them, mark them as used, or unplan them. Once you move, resize or edit one, it becomes yours, the sparkle disappears, and Replan and Unplan leave it alone by default.

Keep your plan up to date

  • Mark sessions as used when you do them. Otherwise Shovel will plan that time again.
  • Click Replan when you’ve missed sessions or have new work. It fits them in and rearranges Shovel’s upcoming sessions around them.
  • Plan each new week when you get to it. Work that belongs to later dates is planned then.

Unplan

The Unplan button next to Auto-plan removes planned sessions from the dates on screen. Your tasks stay; only their planned time is removed.

  • By default it removes only upcoming sessions Auto-plan created that you haven’t changed.
  • Tick Also unplan N manually planned or edited sessions to remove those too.
  • Sessions that have already started or are marked as used always stay.

There’s no undo for Unplan, but you can run Auto-plan again to get a new plan.

Sharing Feedback

At the bottom of the preferences there’s a Help us improve auto-planning link. Tell us what Auto-plan should do better. We read every message.

Frequently Asked Questions

Why didn’t Auto-plan plan one of my tasks?

The most common reasons:

  • It has no time estimate. Check the Not estimated list.
  • It’s already fully planned or marked as done.
  • It’s past its due date. Check the Overdue list, and move its due date if you still need to do it.
  • Its work belongs to later dates. It’s in “Left for later”. Plan those dates when you get to them.
  • There’s no free study time before it’s due. It’s in “Won’t fit”.
  • Its planning window doesn’t overlap the dates on screen. Check its due date and days to start ahead.

Why did Auto-plan plan time for a task I already did?

You probably didn’t mark the session as used. Shovel treats sessions that ended without being marked as used as missed, and plans that time again. Mark the session as used (in the Missed sessions list or with the ✓ Used? button on the calendar), then replan.

Why did my sessions move after I clicked Replan?

Replan rearranges the upcoming sessions Auto-plan created to fit missed sessions and new work. If you want to keep a session where it is, move or edit it yourself first (it then becomes yours), or untick the Replan checkbox to only fill free time.

Why didn’t Replan move a session?

It’s either a session you planned yourself, an Auto-plan session you changed, a session that has already started, or one marked as used. To include your own and edited sessions, tick Also replan N manually planned or edited sessions.

Why is a session at a time I didn’t pick as preferred?

Preferred times only choose among the free times available. If your preferred time of day is full, Shovel uses other free times rather than leaving the work unplanned.

Why is there study on my day off (or a longer day than my limit)?

The week didn’t have enough free time for everything due, so Shovel gave up that preference to fit the work. The note under “Your planning preferences” tells you which preferences were given up. Rank the preference higher if you want it kept longer.

Why was a task planned before its start date?

In a tight week, starting a task earlier is the first thing Shovel tries to make room (you can change this in Hardest to give up).

Why is so much “Left for later”?

Your pacing settings decide when work happens. With “Close to deadline”, or for tasks due well after the dates on screen, the work belongs to later dates. It will be planned when you plan those dates.

Why does a big task have several sessions?

Tasks longer than your ideal session length are split into several sessions. Change Ideal deep work session length per task to make sessions longer or shorter.

Why are some small tasks squeezed between classes?

Short gaps between classes are good for small tasks. Shovel keeps longer stretches of free time for deep work when it can, and tends to group small tasks from the same course together.

Where did these “Review:” tasks come from?

They’re review sessions for your readings. You can turn them off by unticking Add review sessions after reading tasks. If you delete one, Shovel won’t create it again.

Can I undo a plan?

Use Unplan to remove the sessions Auto-plan created, or Replan to plan again with different preferences.

Does Auto-plan work on my phone?

Not yet. Auto-plan is on the web app. Sessions you plan there show up on your calendar everywhere.